logo

Performance Audit: Compabloc

Performance Audit: Compabloc

  • Optimized service intervals to meet your process requirements
  • Reduced energy costs thanks to improved thermal efficiency and lower pressure drop
  • Better planning to give you full control of production uptime and your maintenance budget
  • Improved sustainability in your processes with longer life for your equipment

Description

Remote Guidance Unboxing - Compabloc

Technical details

Valid for
Whole Compabloc range (CP15 to CP120)
Type of service
Audit
Recommended service interval
Implementing a proactive maintenance culture Designing your ideal service schedule Minimizing the risks of unplanned shutdowns
Next steps
In order to properly perform an Performance Audit, and provide you with the best results, your Alfa Laval technician will need the following information in advance: 1. Flow rate for the inlet and outlet on both sides 2. Inlet and outlet temperatures for all media 3. Properties of the fluids, if changed 4. Configuration of the heat exchanger 5. Piping & installation diagrams for the heat exchangers and process flow diagrams for the overall plant 6. Inlet/outlet temperatures, pressures and flow rates covering at least the preceding 12 months (a template for this information is available) 7. Start-up and shut-down procedures (i.e. cold or hot start-up, etc.) 8. The heat exchanger’s original thermal data sheet